Showing posts with label inspection. Show all posts
Showing posts with label inspection. Show all posts

Sunday, 7 April 2013

Day 109

Apr. 05  2013
Today we have received the pre-plaster inspection result, there're still 20 defects, in which 9 of them being legacies of frame inspection, 11 new finds. Not sure how they can be re-inspected before covering plaster, looks like the plaster will be going up very soon…Nonetheless, we’re quite happy with the progress of the build, credit to our SS.

Thursday, 4 April 2013

Day 78

New Home Inspections
Mar. 06  2013

Today we received our first inspection result, to our surprise, we got 17 defects. However considering we did the frame inspection slightly before frame completion, all the defects shall be revisited in the pre-plaster inspection.